SALIENT FEATURES

SYSTEM : Light Metro Rail

ROUTE LENGTH : 13.33 Kms (Fully Elevated)

NUMBER OF STATIONS : 14

ESTIMATED COMPLETION COST : Rs. 2509 Cr.

ESTIMATED COMPLETION PERIOD : 4 years

STATIONS

  • 1.Medical College
  • 2. Chevayur
  • 3. Thondayad
  • 4.Kottuli
  • 5. New Bus Stand
  • 6. KSRTC
  • 7. Mananchira
  • 8. Palayam
  • 9. Railway Station
  • 10. Pushpa
  • 11. Kallayi
  • 12. Panniyankara
  • 13. Vattakkinar
  • 14. Meenchanda

TECHNICAL FEATURES

GAUGE
Standard (1435 mm)
CIVIL STRUCTURES
Concrete deck with precast segmental construction supported on piers of about 1.6 metre diameter, generally located on the median of the road
TRAIN SET
2 cars initially, 3 cars later
Voltage
750 V DC
Power Supply source
Two independent receiving Grid Substations of KSEB.
SCADA system
Provided
Method of supply
Through third rail

ROLLING STOCK

a.General
18.0m long, 2.7m wide modern rolling stock with ring bolster bogies and aluminium or stainless steel body
b.Axle load
13.0 t
c.Capacity of 2 coach
400 passengers with 6 persons/sqm. 500 passengers with 8 persons/sqm.
* The above are indicative

SIGNALLING, TELECOMMUNICATION & TRAIN CONTROL

Type of Signalling
Communication Based Train Control (CBTC) with cab Signalling and ATO.
Telecommunication
Integrated System with Fibre Optic Cable, SCADA, Train Radio, PA system etc.

FARE COLLECTION

Automatic Fare Collection System with combination of Contactless Smart Card for multiple journeys and Contactless Smart Token for single Journey

Follow Us

facebook facebook facebook facebook facebook facebook

© Kerala Rapid Transit Corporation Limited . All Right Reserved | Powered by Afx Media