SALIENT FEATURES
SYSTEM : Light Metro Rail
ROUTE LENGTH : 21.821 Kms (Fully Elevated)
NUMBER OF STATIONS : 19
ESTIMATED COMPLETION COST : Rs. 4219 Cr.
ESTIMATED COMPLETION PERIOD : 5 years
STATIONS
-
1,Technocity
-
2,Pallipuram
-
3,Kaniyapuram
-
4,Kazhakoottam Jn
-
5,Kazhakoottam
-
6,Karyavattom
-
7,Gurumandiram
-
8,Pangappara
-
9,Sreekaryam
-
10,Pongumoodu
-
11,Ulloor
-
12,Kesavadasapuram
-
13,Pattom
-
14,Plamoodu
-
15,Palayam
-
16,Secretariat
-
17,Thampanoor
-
18,Killipalam
-
19,Karamana
TECHNICAL FEATURES
- GAUGE
- Standard (1435 mm)
- CIVIL STRUCTURES
- Concrete deck with precast segmental construction supported on piers of about 1.6 metre diameter, generally located on the median of the road
- TRAIN SET
- 3 cars initially, 4 cars later
- Voltage
- 750 V DC
- Power Supply source
- Two independent receiving Grid Substations of KSEB.
- SCADA system
- Provided
- Method of supply
- Through third rail
- TRAIN SET
- 3 cars initially, 4 cars later
ROLLING STOCK
-
a.General
-
18.0m long, 2.7m wide modern rolling stock with ring bolster bogies and aluminium or stainless steel body
-
b.Axle load
-
13.0 t
-
c.Capacity of 3 coach
-
600 passengers with 6 persons/sqm.
750 passengers with 8 persons/sqm.
* The above are indicative
SIGNALLING, TELECOMMUNICATION & TRAIN CONTROL
-
Type of Signalling
-
Communication Based Train Control (CBTC) with cab Signalling and ATO.
-
Telecommunication
-
Integrated System with Fibre Optic Cable, SCADA, Train Radio, PA system etc.
FARE COLLECTION
Automatic Fare Collection System with combination of Contactless
Smart Card for multiple journeys and Contactless Smart Token for
single Journey